Installation pages cover the homeowner handoff and the contractor workflow: site assessment, roof and structural checks, electrical design, wiring and protection, permits and interconnection, and inspection and commissioning.

Best starting points

Planning and site assessment

Site conditions, retrofits, logistics, and design choices before work begins.

Browse all installation articles

Roof and structural work

Dead load, wind and snow loads, attachments, and roof-integrity checks.

Browse all installation articles

Electrical design

Inverters, balance-of-system components, and thermal management.

Browse all installation articles

Wiring and protection

Wiring, string sizing, voltage drop, protection, and electrical safety.

Browse all installation articles

Permits and interconnection

Permits, inspections, and interconnection requirements.

Browse all installation articles

Battery and backup integration

Battery and backup integration with the installed system.

Browse all installation articles

Inspection and commissioning

Pre-energization checks, startup, records, and handoff.

Browse all installation articles

Commercial and utility installation

Utility-scale, farm, and commercial installation case studies.

Browse all installation articles

Maintenance and troubleshooting

Routine checks, warning signs, and repair workflow.

Browse all installation articles

Research and industry

Studies and industry findings relevant to installers.

Browse all installation articles